The MTU America Phase 3 Expansion project site in Mankato includes a 28,000 sf addition to the company's existing assembly hall. Installation and relocation of precast panels is underway for the Phase 1 addition, along with CMU interior block walls topped with hollow-core plank, exterior concrete paving and installation of bituminous paving.